Skip to content

[ CASE STUDY ] 05 / 07

SIGNFLOW

0Third-party estimating tools left to pay for

SignFlow: Custom MERN Application Case Study

The SignFlow takeoff interface with sign traces placed on a PDF
INDUSTRY
Signage (built for Coastal Signs Plus, Inc.)
SERVICES
Custom Web Application · UX & Interface Design · Deployment · Ongoing Maintenance & Support
PLATFORM
MERN (MongoDB, Express, React, Node.js) with Next.js

[ 02 ] OVERVIEW

Digital Hype Media partnered with Coastal Signs Plus, Inc. to design, develop, and deploy SignFlow, a custom-built sign estimating and takeoff platform created to replace their reliance on eTakeoff.

Built using a modern MERN stack (React, Next.js, Node.js, MongoDB), SignFlow was designed as a purpose-built internal system that streamlines sign estimation, reduces software costs, and gives Coastal Signs Plus full ownership of their workflow and data.

The platform is now actively used in daily operations, with ongoing support and maintenance provided by our team.

[ 03 ] THE CHALLENGE

The Challenge

Coastal Signs Plus relied on third-party estimating tools that were expensive, bloated with unnecessary features, and not tailored to the real-world needs of a signage company. Key challenges included:

  • High recurring licensing costs
  • Inefficient workflows for sign counting and takeoffs
  • Limited customization and flexibility
  • No ownership of data or long-term control over the platform

They needed a focused, fast, and scalable alternative built specifically for their internal processes.

[ 04 ] THE SOLUTION

The Solution

We designed and built SignFlow, a custom web application engineered specifically for signage estimation and area calculations.

The system allows users to upload project PDFs, visually place sign traces, automatically count signage, calculate mural and wall areas, and export clean reports for estimating and production.

The entire platform was designed with usability, speed, and accuracy in mind, eliminating unnecessary complexity while improving operational efficiency.

[ 05 ] PLATFORM FEATURES

Platform Features

01Project & PDF Management

  • Upload PDFs and treat each file as a standalone project
  • Organized project storage with easy retrieval
  • Secure project creation and management

02Interactive Takeoff System

  • Drag-and-drop sign placement directly onto PDFs
  • Support for multiple sign types, colors, and attributes
  • Persistent database storage for all traces

03Automated Sign Counting & Exports

  • Automatic tallying of sign quantities by type
  • Exportable Excel summaries for estimating
  • Annotated PDF exports for internal records and approvals

04Area Measurement Tools

  • Point-and-click area measurement for wall murals and large-format graphics
  • Automatic square footage calculation
  • Custom scaling controls set during PDF import

05Multi-User Access

  • Supports concurrent users within the organization
  • Built for collaborative internal workflows

[ 06 ] DEPLOYMENT & SUPPORT

Deployment & Support

SignFlow was deployed as a production-ready system with flexibility for both local and cloud hosting environments. Following launch, Digital Hype Media continues to provide:

  • Ongoing maintenance and monitoring
  • Performance optimizations
  • Feature updates and refinements
  • Infrastructure guidance and support

This ensures the platform remains stable, secure, and aligned with evolving business needs.

[ 07 ] RESULTS

Results & Impact

  • Eliminated reliance on third-party estimating software
  • Reduced recurring licensing and tooling costs
  • Faster, more accurate sign takeoffs and estimates
  • Full ownership of software, data, and workflows
  • A scalable foundation for future SaaS expansion, if desired

SOURCE: SIGNFLOW CASE STUDY

[ 08 ] TECHNOLOGY STACK

Technology Stack

  • FRONTENDReact.js, Next.js
  • BACKENDNode.js, Express.js
  • DATABASEMongoDB
  • PDF & CANVAS HANDLINGCustom canvas-based interaction layers
  • HOSTINGCloud server deployment options based on client preference

[ 09 ] GALLERY

The SignFlow project dashboard
Placing sign traces on a project PDF in SignFlow
SignFlow sign counts by type
SignFlow area measurement on a wall mural
A SignFlow export summary

[ 10 ] THE BOTTOM LINE

The Bottom Line

SignFlow is now a core operational tool for Coastal Signs Plus, built around how their team actually works, not how generic software assumes they should.

Digital Hype Media designed and delivered a fully custom estimating platform that replaced legacy tools, improved efficiency, and gave Coastal Signs Plus complete control over their estimating process.

SignFlow is a strong example of how custom software, when built correctly, can become a long-term operational asset rather than an ongoing expense.

NEXT CASE STUDYVelara WellnessA calm, credible, conversion-focused website for a premium mental health brand.Read it